Exam4Training

What should you do?

You have an Azure Factory instance named DF1 that contains a pipeline named PL1.PL1 includes a tumbling window trigger.

You create five clones of PL1. You configure each clone pipeline to use a different data source.

You need to ensure that the execution schedules of the clone pipeline match the execution

schedule of PL1.

What should you do?
A . Add a new trigger to each cloned pipeline
B. Associate each cloned pipeline to an existing trigger.
C. Create a tumbling window trigger dependency for the trigger of PL1.
D. Modify the Concurrency setting of each pipeline.

Answer: B

Latest DP-203 Dumps Valid Version with 116 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version