What should you do?
You have a product that can be manufactured on two different production lines in the same warehouse. You create resources and then create individual input locations for the resources. You create two routes. Each route uses different resources.
Materials are staged for consumption in different locations based on the resources being utilized for production.
You need to set up the formula to consume the goods from the correct line-side location.
What should you do?
A . Select resource consumption and the operation for each line.
B . Select a warehouse and consumption operation for each line.
C . Select the plan group and consumption operation for each line.
D . Specify a site in the formula header.
Answer: A
Latest MB-320 Dumps Valid Version with 141 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund