When reviewing, the learn discovers that they have not estimated story 3 correctly. In hindsight they should have estimated that user story as 8 story points.
What should the team do?
A . Re-estimate the velocity of the team as 14 story points
B. Re-estimate user story 2 as 2 story points
C. Re-estimate user story 3 as 8 points
D. The team should not re-estimate anything
Answer: D