What should the project manager do to mitigate this risk using the risk transference strategy?

During risk analysis for a building renovation project, it is discovered that the building contains toxic materials that must be removed.

What should the project manager do to mitigate this risk using the risk transference strategy?
A . Ask the client to remove the toxic materials and exclude this work from the contract.
B . Train personnel how to remove the toxic materials and then perform the work.
C . Increase the management reserves to address the potential impact of additional time and cost.
D . Hire a contractor to perform the work.

Answer: D