What rule must be followed during an upgrade procedure with the FS25 expansion shelf?
What rule must be followed during an upgrade procedure with the FS25 expansion shelf?
A . For high performance, the connections from a controller to FS25 shelves must be over FC cables
B . FS25 shelf is cabled on a separate private chain
C . FS25 shelf must be on the same chain with DS60
D . ES40 SAS shelves are on the same chain as an FS25, the maximum number of shelves on that chain is five
Answer: D