Site icon Exam4Training

What option from below is relevant to the UAT plan structure?

What option from below is relevant to the UAT plan structure?
A . Collect the Issue Logs and save them in the Production plan
B . Establish reporting metrics
C . Stop any new change request
D . Keep the same machine environment after running multiple tests

Answer: B

Exit mobile version