Exam4Training

What is the preferred way to accomplish this?

You have an Operations Center with two connected Masters. You want to start a job on Master B from a fob on Master A .

What is the preferred way to accomplish this?

A. Use the Pipeline build step with the remote path URL argument.

B. Use the cross team collaboration feature to publish a build notification and subscribe to that notice from Jobs that should run when the notification is published.

C. Broadcast an e-mail message from the Job on Master A and monitor the e-mail queue from Master B.

D. Use the "Trigger parameterized build on other projects" post-build step and specify the remote path as project name.

E. Use the trigger-remote-build CLI command and pass the Job URL as a parameter.

Answer: B

Latest CCJE Dumps Valid Version with 90 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version