You have configured Resource Governor with three resource pools.
You have assigned the first resource pool a minimum CPU and memory value of 20%.
You have assigned the second resource pool a minimum CPU and memory value of 30%.
You want to assign maximum CPU and memory values to the third resource pool.
What is the maximum CPU and memory value you can assign to this resource pool?
A . 30%
B . 50%
C . 70%
D . 100%
Answer: B
Explanation:
The maximum resource value assigned to the third pool is 100%; the sum of the minimum resource values assigned to the other pools is 50%.
Latest 70-764 Dumps Valid Version with 451 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund