What is the first step that the Enterprise Layer Manager (ELM) server takes when creating application layers?
A . Once the engineer manually creates the packaging machine, the ELM server initiates a connection to the packaging machine
B . Once a packaging machine is created, the next step is to finalize the targeted installation, using the application layering finalization software
C . Once the process to create a layer is initiated from the Layering Management Console, the ELM server then uses a connector to build a packaging machine
D . Once the packaging machine is finalized, any application installation or configuration
should be performed and completed
Answer: C
Latest 1Y0-312 Dumps Valid Version with 99 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund