Exam4Training

What is the expected outcome?

An engineer changed me TPC Power Threshold for a wireless deployment from the default value to -65 dBm. The engineer conducts a new post deployment survey to validate the results.

What is the expected outcome?
A . increased received sensitivity
B . decreased channel overlap
C . decreased client signal strength
D . increased cell size

Answer: C

Latest 300-425 Dumps Valid Version with 100 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version