Due to an unexpected power outage, Site A is completely down.
The disaster recovery strategy was implemented (see diagram).
What is the correct way to start replicated VMs on Site B, while ensuring you can failback after Site A comes back online?
A . Execute "Permanent failover" from vCenter.
B . Execute "Planned failover".
C . Power on VMs manually through vCenter.
D . Perform "Failover".
Answer: D
Explanation:
"Failover Now: Failover now refers to an immediate response to an unexpected system or service failure. In this case, the primary system or service experiences an unplanned outage or becomes unavailable, and the failover process is triggered immediately to shift the workload to a secondary system or service."
Latest VMCE2021 Dumps Valid Version with 100 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund