- All Exams Instant Download
What Is the correct value to use In the Elapsed Time Interval field along with the Elapsed Time Attribute?
An administrator want to create a time based escalation point to evaluate to 30 days in the future.
What Is the correct value to use In the Elapsed Time Interval field along with the Elapsed Time Attribute?
A . Today+ 30
B . Sysdate+30
C . +30 (positive 30)
D . -30 (negative 30)
Answer: C
Latest C2010-555 Dumps Valid Version with 144 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments