You apply the Integration of Manufacturing Execution System to Production Operation (1Y5) scope item and the production supervisor changes the quantity of a released production order in SAP S/4 HANA Cloud.
What is the consequence for the corresponding shop order in the shop floor system?
A . The shop order is deleted and a new shop order with the new quantity is created
B . The shop order is flagged for manual change in the shop floor system
C . The shop order is updated asynchronously by a daily background job
D . The shop order is changed automatically in the shop floor system
Answer: D