Exam4Training

What is the best way to proceed?

You have been assigned to perform a hardware installation of three E560 nodes. When you get onsite, you realize that the customer only has a 2-post-Telco rack for the installation. In addition, there are only sliding rails included with this shipment.

What is the best way to proceed?
A . Order static rails, since these are required for the installation
B . Proceed directly because these nodes can be installed in a 2-post-Telco rack
C . Install cable management arms in the rack
D . You cannot proceed because all VxRail models require a 4-post rack

Answer: A

Latest DES-6321 Dumps Valid Version with 103 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version