An administrator is receiving notifications about insufficient power for a PowerEdge MX7000 chassis. The chassis is fed from two different power grids.
What is the best policy to maximize power and maintain uptime?
A . PSU Pairing
B . Grid Redundancy
C . PSU Redundancy
D . No Redundancy
Answer: D