What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?

What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?
A . Use production lead times and offsets to manage components at the outsourced manufacturing location
B . Ensure that the outsourced manufacturing locations have a separate subnetwork
C . Model target inventory and stocks at the outsourced manufacturing location
D . Model relative production costs across internal locations and outsourced manufacturing locations

Answer: D

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments