An organization uses tape libraries in their current backup infrastructure. They have purchased a PowerProtect DD system and plan to use VTL to move from physical tape.
What is a consideration when configuring the tape size?
A . Use multiple drives to write multiple streams
B . Set retention periods for as long as possible
C . Target multiple drives to write single stream
D . Use larger tapes for multiple smaller datasets
Answer: A
Latest D-PDD-DY-23 Dumps Valid Version with 147 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund