You are ordering three All-Flash G560 nodes for a new installation. These nodes need to be connected to a ToR Dual Switch Topology.

What is a consideration for this installation?
A . Link aggregation must be enabled on VxRail switch ports
B . All G560 nodes must be configured with four ports for network traffic
C . IPv6 Multi cast must be enabled in this environment
D . All-Flash VxRail models must use 25 GbE NICS

Answer: C