What does the non-final getFlowProblemOperator activity determine in the flow error resolution process? (Choose One)
A . The work item that the system cannot find.
B . The Decision result to select the appropriate connector.
C . The appropriate shape to advance in the flow.
D . The operator to inform and the Assignment type.
Answer: D
Latest PEGACPLSA23V1 Dumps Valid Version with 430 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund