You want to use a template for activity and process assignment to your material cost estimate .
What do you need to do?
A . Assign a template to an operation in the routing of the material
B . Use the costing sheet of the costind view 1 in the template determination table
C . Assign a template directly to costing view 1 of the material master record
D . Use the template allocation function in the material cost estimate and the costing run
Answer: D