What do you need to do?

You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way torecord measurement documents.

What do you need to do? Note: There are 2 correct answers to this question.
A . Assign a piece of equipment with an allocated measuring point to a task list operation.
B. Assign an inspection lot to the task list header.
C. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
D. Assign an inspection document as PRT to the task list operation.

Answer: A,C

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments