An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master .
What determines whether the storage location can be derived from the production version?
A . MRP group
B. Plants parameters
C. MRP controller
D. MRP profile
Answer: A
Latest C_TS422_1909 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund