What determines the replenishment strategy of a component in the SAP Best Practices Scenario Manufacturing with Kanban Supply into Production (1E3)?
What determines the replenishment strategy of a component in the SAP Best Practices Scenario Manufacturing with Kanban Supply into Production (1E3)?
A . Control cycle
Production Supply area
B . MRP type
C . Procurement type
Answer: A