What determines the replenishment strategy of a component in the SAP Best Practices Scenario Manufacturing with Kanban Supply into Production (1E3)?

What determines the replenishment strategy of a component in the SAP Best Practices Scenario Manufacturing with Kanban Supply into Production (1E3)?
A . Control cycle
Production Supply area

B . MRP type
C . Procurement type

Answer: A