What describes the remote replication Planned Failover operation?
A . Run automatically by the replication source system as a result of a planned source system maintenance event.
B . Run automatically by the replication destination system before a scheduled source system outage.
C . Run manually from the replication destination system by the administrator after a planned source system maintenance event.
D . Run manually from the replication source system by the administrator before a scheduled source system outage.
Answer: D
Latest D-PST-OE-23 Dumps Valid Version with 140 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund