What controls the material BOM item category? Note: There are 2 correct Answers to this question.
A . A work center is required.
B. A change number is required.
C. A material number is required.
D. A negative quantity is allowed.
Answer: C,D
Latest C_TS411_2021 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund