What can be determined when auditing is enabled on an EMC Isilon cluster?
A . Who made the change When the change was made If the change can be undone
B . When the change was made If the change can be undone If proper ITIL process was followed
C . Who observed the change When the change was made If the change can be undone
D . When the change was planned If the change can be undone If proper change control was followed
Answer: A