universal container requires trained inspectors to make 3 site visits per year to inspect the container customers’ sites. These visits must be scheduled within 14 days of inspection due date.
What are two ways a Consultant can configure maintenance plans to meet the requirements? Choose 2 answers
A . Auto generate work order with a 14 days generation horizon
B . Associate work type called site to maintenance plan
C . Associate a required skill call site visits to maintain plans
D . Auto generate work order with 14-day generation time frame
Answer: A,B