A Cloud Administrator is looking to migrate several dozen workloads from their on-premises location to a VMware public cloud using VMWare — need to be stretched for the migration. They will also be utilizing the capabilities of the WAN application for the migration.
HCX appliance requirements are as follows:
HCX Manager: 4 vCPU, 128GB Memory
HCX-IX Interconnect: 8 vCPU, 3GB Memory
HCX network Extension: 8 vCPU, 3GB Memory
HCX WAN Optimization: 8 vCPU, 14GB Memory
What are the on-premises vCPU and Memory component requirements for the VMWare HCX deployment?
A . 36 vCPUs, 35GB of memory
B . 32 vCPUs, 40GB of memory
C . 30 vCPUs, 36GB of memory
D . 28 vCPUs, 32GB of memory
Answer: A
Explanation:
https://docs.vmware.com/en/VMware-HCX/4.6/hcx-user-guide/GUID-D64901F4-6AB4-4820-9303-27927648A34D.html