VMware 5V0-35.21 VMware vRealize Operations Specialist Online Training
VMware 5V0-35.21 Online Training
The questions for 5V0-35.21 were last updated at Nov 23,2024.
- Exam Code: 5V0-35.21
- Exam Name: VMware vRealize Operations Specialist
- Certification Provider: VMware
- Latest update: Nov 23,2024
An administrator has been tasked with configuring vRealize Operations to ensure that workload performance across the VMware SDDC is the main priority. In the event of an issue, remediation activities should be automatically completed to minimize any impact to running workloads. A maximum of 10% cluster resources should be reserved for burst capacity.
Which option should the administrator configure to meet these requirements?
- A . Business Intent
- B . Reclamation
- C . Operational Intent
- D . Rightsizing
While creating a What-If Analysis to compare datacenters, the administrator would like to simulate 25% utilization of the resources.
Which workload option should be included in the scenario?
- A . Memory
- B . Annual Projected Growth
- C . Expected Utilization
- D . CPU
An administrator is working on a non-credential based service discovery in a virtualization environment using vRealize Operations.
Which package is a base requirement of the virtual machine?
- A . Telegraf Agent
- B . .NET
- C . Remote Collector
- D . VMware Tools
Which two are supported Cloud Account types in vRealize Operations? (Choose two.)
- A . Microsoft Azure
- B . Horizon Connection Server
- C . Google Cloud Platform
- D . vRealize Automation
- E . vCenter Server
After deploying vRealize Operations, an administrator needs to configure cost drivers to accurately reflect the purchase price and date of all nodes within the VMware vSAN cluster that are being monitored.
Which type of cost driver should the administrator select?
- A . Server Hardware: Hyper-Converged
- B . Storage
- C . Server Hardware: Traditional
- D . Additional Costs
Which option in vRealize Operations is able to calculate measurements on a Guest OS?
- A . Custom Script
- B . HTTP Check
- C . UDP Check
- D . TCP Check
At which frequency are new services discovered when using Service Discovery in vRealize Operations?
- A . Every 15 minutes
- B . Every 24 hours
- C . Every 5 minutes
- D . Every hour
An administrator deployed vRealize Operations and has been tasked with ensuring that the VMware SDDC remains compliant to the VMware vSphere Security Configuration Guide. The compliance benchmark is showing that the VMware SDDC is not completely compliant to the standards.
Which three symptoms could have triggered a compliance alert? (Choose three.)
- A . The lockdown mode on a vSphere ESXi host is set to Disabled.
- B . Transparent Page Sharing is Disabled on a virtual machine.
- C . The SNMP service on a vSphere ESXi host is set to Disabled.
- D . The Enable 3D Support setting for the Virtual Machine is set to FALSE.
- E . The Disable console copy operation for a Virtual Machine is set to FALSE.
- F . The Forged Transmit policy is set to allow on a Distributed Port Group.
Which two statements accurately characterize reports in vRealize Operations? (Choose two.)
- A . Views and Dashboards are the only data types available for a report.
- B . Only PDF type reports can be used to schedule a report generation.
- C . A report layout can contain table of contents, cover page, and footer.
- D . Scheduling of reports can be done hourly, daily, weekly, and monthly.
- E . Reports scheduled for generation can only be shared out via email.
A customer is using multiple vRealize Operations (vROps) instances and has one central development vROps instance for creating dashboards. The administrator is tasked to share the newly created dashboards with other vROps instances, and the dashboards must be editable in the other instances.
Which action should the administrator take to accomplish this goal?
- A . Generate a custom URL, set the expiration to "never expire", and import this URL into the other instance.
- B . Use the Embed option to import the HTML code into the other instances.
- C . Connect the vROps instances together, and synchronize the dashboards.
- D . Export the dashboard from the development instance, and import the dashboard into the other instance.