A company is implementing a new cluster to support its end user desktop workloads.
• The workload is required to support 200 virtual machines.
• Each end-user desktop is configured with two vCPUs, 8GB of RAM, and 40GB of thick-provisioned disk space.
• The architect has expressed concerns that virtual machine swap files will till the 8.5TB datastore available to the cluster.
Which two strategies would address the architect’s concern? (Choose two.)
- A . Configure an additional datastore for snapshot storage
- B . Configure an additional datastore for vswap file storage
- C . Configure each virtual machine with a 4GB memory reservation.
- D . Configure each virtual machine with a 8GB memory reservation.
A company has developers located in Eastern Europe (EE) and a QA Department in Bermuda.
• The company is planning to create an environment based on a blueprint of 4-8 virtual machines for each of the developers and one for every QA project.
• The proposed configuration will allow each developer to work independently and be able to collapse and re-create the environment as needed.
• QA Teams will be able to recreate the environment that is required for a specific application.
• Individual virtual machines in the blueprint are being continually updated with newly available software packages.
• The company is planning to use the vSphere Content Library to store images and synchronize them between sites.
Which four supported configurations can the company implement? (Choose four.)
- A . EE and Bermuda libraries that are backed by an NFS file system.
- B . EE and Bermuda vCenter Servers with Enhanced Linked Mode.
- C . FTP protocol to transfer data between published in EE and subscribed in Bermuda libraries.
- D . Published library in EE backed by an NFS file system while subscribed library in Bermuda is backed up by datastore.
- E . A minimum 10 GbE connection between EE published and Bermuda subscribed libraries is required.
- F . EE and Bermuda vCenter Servers without Enhanced Linked Mode.
A company has requested that a new vSphere 6.5 design be created.
• The existing environment consists of 32 vSphere 6.0 hosts attached to an iSCSI storage array.
• The storage arrays contain external customer financial and medical records used by the company’s investment and medical services division.
The design must:
• protect the company’s existing data center investment
• expand to a second data center site
• introduce process automation
• expand to and fail over to public cloud
Which two non-functional requirements are applicable for this design? (Choose two.)
- A . The product of the design must account for regulatory compliance.
- B . The automation solution must be compatible with the existing equipment.
- C . The product of the design must feature 3DES encryption at the virtual machine disk level.
- D . At least two 10Gbps interfaces must be dedicated to storage on each host.
- E . Every host in the design must have Lockdown Mode enabled for security.
A customer is using blade servers with only one HBA.
Which two design concepts apply to this scenario? (Choose two.)
- A . Assumption
- B . Risk
- C . Constraint
- D . Requirement
DRAG DROP
Categorize the tools as providing either Availability or Recoverability.
An architect is designing a vSphere 6.5 implementation.
• The customer requires Cross vCenter vMotion for the newly-created data centers in New York and Houston.
• Each data center will use different IP networks for management and vMotion.
When creating a vMotion network, which two statements are required in order to use Cross vCenter Server vMotion? (Choose two.)
- A . vMotion Networks in both data centers must be in the same L2 stretched VLAN.
- B . The virtual machine port groups must use the same name.
- C . VMkernel port for vMotion must be configured with vMotion TCP/IP Stack with the correct gateway.
- D . vMotion networks in both data centers must be routable over L3 network.
A customer is virtualizing a mission-critical Microsoft SQL database and needs a configuration that provides optimal NUMA performance.
• There are two possible clusters that the database virtual machine could reside in: Cluster A is vSphere 6.0 and Cluster B is vSphere 6.5.
• All ESXi hosts contain dual Intel Xeon E5-2650 v3 processors (ie: 2 socket, 10 cores per socket) and 256Gb RAM with vNUMA in its default configuration.
Given this scenario, which three statements are true? (Choose three.)
- A . Enabling CPU Hot Add on a virtual machine will disable vNUMA.
- B . Placing a 10 vCPU VM in Cluster A and configuring it with 2 Sockets and 5 Cores Per Socket will result in 2 vNUMA nodes.
- C . Placing a 10 vCPU VM in Cluster B and configuring it with 2 Sockets and 5 Cores Per Socket will result in 2 vNUMA nodes.
- D . Enabling Memory Hot Add on a virtual machine will disable vNUMA.
- E . Placing the VM in Cluster B and configuring it with 5 Sockets and 2 Cores Per Socket will result in 1 vNUMA node.
The customer has two sites that must operate independently of each other in the event of a WAN failure. During normal operations, administrators from each site must be able to manage the other site through the vSphere Web Client.
Which vCenter Server Appliance (VCSA) and Platform Services Controller (PSC) diagram shows the VMware-recommended design that satisfies these requirements?
- A . Exhibit A
- B . Exhibit B
- C . Exhibit C
- D . Exhibit D
A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:
• The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.
• The new servers have a 90-day delivery time.
• A data center for disaster recovery has been selected, and it is 20 miles away and connected by MPLS.
• The security team will continue to utilize its current investments and VM Encryption for the new environment.
• The backup team currently uses Data Domain, and reports show an 8:1 compression and deduplication ratio for backups.
Based on the information obtained, which two statements are risks for the new design? (Choose two.)
- A . MPLS will be used to connect the two data centers.
- B . The Change Advisory Board will approve all changes.
- C . Current back up space will not be sufficient if using VM Encryption.
- D . The current firewalls will support the additional workloads.
The hardware operations team is planning to purchase new ESXi hosts for the upcoming budget year and is requesting recommendations on the type of servers to purchase for a web application. The web application consists of hundreds of small virtual machines (1 vCPU and 8GB of RAM) that are members of a software cluster.
The solution should have these abilities:
• recover from ESXi host hardware failures
• zero downtime for a limited number of critical virtual machines (VMs)
• migrate running VMs between ESXi hosts without interruption to the operating system
• perform these functions using VMware ESXi servers, vCenter Server, and high-speed network interfaces
What are the three functional requirements and their associated VMware technologies? (Choose three.)
- A . automatic restarts of failed VMs (vSphere HA)
- B . high speed network interfaces (vSphere Distributed Switches)
- C . ability to migrate running VMs (vSphere vMotion)
- D . fault tolerance for limited number of critical VMs (vSphere FT)
- E . VMware ESXi Servers (vSphere Auto Deploy)