VMware 3V0-624 VMware Certified Advanced Professional 6.5 – Data Center Virtualization Design Exam Online Training
VMware 3V0-624 Online Training
The questions for 3V0-624 were last updated at Feb 03,2025.
- Exam Code: 3V0-624
- Exam Name: VMware Certified Advanced Professional 6.5 – Data Center Virtualization Design Exam
- Certification Provider: VMware
- Latest update: Feb 03,2025
A customer wants to make its data available with a RPO of 10 minutes. Replication to the second data center will be done using the network.
Which type of storage configuration should be used?
- A . NFS datastore on ESXi 6.0 with vSphere replication appliance 6.0
- B . VMFS datastore on ESXi 6.0 with vSphere replication appliance 6.5
- C . vSAN datastore on ESXi 6.0 with vSphere replication appliance 6.5
- D . VMFS datastore on ESXi 6.0 with vSphere replication appliance 6.0
DRAG DROP
A leading steel manufacturer relies on SAP for purchase, sales, add invoice processing.
• It is planning to virtualize its severs to reduce CAPEX and OPEX.
• However, its CIO is concerned about the availability, performance, manageability, recoverability, and security for the SAP database and ERP instance.
Match the business requirement with the appropriate design concept.
After the vSAN iSCSI Target service is enabled, which statement about iSCSI networks is true?
- A . A separate VMkernel interface may be configured per target.
- B . A single VMkernel interface must be selected for all iSCSI targets.
- C . The vSAN iSCSI Target service always uses all Management VMkernel interfaces.
- D . The vSAN iSCSI Target service always uses the vMotion network.
A solution architect has finished conducting interviews and gathering requirements for a company, and has determined that the logical requirements are:
• two data centers for high availability
• synchronous replication to meet the zero minute RPO
• separating management workloads from application workloads
• dedicated 10Gb uplink for each low latency server
• single management port for the entire environment
Which two actions would meet the design requirements? (Choose two.)
- A . Create two data center objects in vCenter Server.
- B . Configure vSAN Stretched Clustering.
- C . Configure SR-IOV for low latency servers.
- D . Create one folder for Management workloads and one folder for application workloads.
A customer has requested a high availability option for its data center in the event of power failure and the loss of connectivity to a virtual machine.
Which three vSphere features support fault tolerance? (Choose three.)
- A . HA
- B . Virtual volume datastore
- C . vMotion
- D . Storage-based policy management
- E . DRS
- F . Virtual machine snapshots
DRAG DROP
A global financial company has requested assistance with a new cross-site failover design between two sites which will support business critical applications. Latency between the sites is less than 5ms round-trip.
The company requires:
• application must be restarted quickly in the event of a total site failure
• allow for planned migration during maintenance
• applications must be kept online even when migrated due to planned maintenance
Drag each statement to its correct concept:
DRAG DROP
A company has requested assistance with a new cross-site failover design between two sites which will support business-critical applications. Latency between the sites is less than 5ms round-trip.
The company requires:
• application must be restarted quickly in the event of a total site failure
• allow for planned migration during maintenance
• applications must be kept online even when migrated due to planned maintenance
Drag each statement to its correct concept.
DRAG DROP
A customer is currently running a vCenter Server 5.5 environment with 48 identically-configured ESXi hosts.
• These ESXi hosts are divided into six 8-host HA/DRS clusters.
• The customer wants to upgrade to vSphete 6.5 and combine all of its ESXi hosts into a single 48-host HA/DRS cluster.
Place these actions in the correct order to accomplish this.
A company is implementing a new ESXi host cluster at its New York data center.
• The CIO has stated that the new ESXi cluster should be deigned with enough failover capacity to sustain two ESXi host failures.
• Six ESXi hosts have been approved for this workload.
• The ESXi hosts are to be purchased from Dell with these specifications:
• 2×10 core 2.2GHz Intel CPU
• 128 GB of memory
• The workload is defined as 150 employee desktop virtual machines each with 3GB RAM reserved.
• All virtual machines should be protected by vSphere High Availability
Which are two true statements regarding failover capacity? (Choose two.)
- A . vSphete HA can be configured to reserve 25% of memory capacity for failover.
- B . vSphete HA can be configured to specify two dedicated failover hosts.
- C . vSphere HA can be configured to reserve 35% of memory capacity for failover.
- D . vSphere HA can be configured to specify one dedicated failover host.
DRAG DROP
Drag each option to its appropriate concept.