Which impact categories have been identified as most important for a LEED project to accomplish?
Which impact categories have been identified as most important for a LEED project to accomplish?A . Increase return on investment, promote human scale developmentB . Protect biodiversity and ecosystem services, improve business efficiencyC . Reduce contribution to climate change, enhance human health and well-beingD . Increase return on investment, promote...
A building manager is comparing the operating cost of the existing boiler to the purchase and operation of a new and more efficient boiler. The building manager discovers that although the upfront cost is significant, purchasing the new boiler would drastically decrease the cost of running and operating the system. This exercise is called
A building manager is comparing the operating cost of the existing boiler to the purchase and operation of a new and more efficient boiler. The building manager discovers that although the upfront cost is significant, purchasing the new boiler would drastically decrease the cost of running and operating the system....
Strategies for improving building occupants' comfort and control may consist of
Strategies for improving building occupants' comfort and control may consist ofA . ensuring adequate ventilation, monitoring carbon dioxide and prohibiting smokingB . installing operable windows, giving occupants lighting control and providing ergonomic furnitureC . designing for proper ventilation, monitoring outdoor airflow and including appropriate acoustic designD . specifying low-emitting materials,...
The range of points required to maintain Gold level of LEED certification is
The range of points required to maintain Gold level of LEED certification isA . 40-49B . 50-59C . 50-69D . 60-79View AnswerAnswer: D Explanation: LEED certification is awarded based on the number of points a project earns across several categories of green building performance. The range of points required to...
In the commercial LEED Rating System, which point range will achieve the Certified level of certification?
In the commercial LEED Rating System, which point range will achieve the Certified level of certification?A . 30-39 pointsB . 40-49 pointsC . 50-59 pointsD . 60-69 pointsView AnswerAnswer: B Explanation: LEED certification is awarded based on the number of points a project earns across several categories of green building...
Which of the following strategies should be conducted first?
A retail store is pursuing LEED for Interior Design and Construction certification. Which of the following strategies should be conducted first?A . Perform a life-cycle analysisB . Create an energy budget analysisC . Conduct a charrette with the project teamD . Perform an energy model according to ASHRAE 90.1View AnswerAnswer:...
The project team is conducting a feasibility study of a building project. The developer has pre-qualified four potential sites that are all financially viable. Within the context of LEED, which site is the most applicable?
The project team is conducting a feasibility study of a building project. The developer has pre-qualified four potential sites that are all financially viable. Within the context of LEED, which site is the most applicable?A . A brownfield site with no access to metroB . A brownfield site in a...
Which credit category attempts to reduce light pollution and discourages the development of previously undeveloped land?
Which credit category attempts to reduce light pollution and discourages the development of previously undeveloped land?A . Regional PriorityB . Sustainable SitesC . Energy and AtmosphereD . Location and TransportationView AnswerAnswer: B Explanation: The Sustainable Sites (SS) category addresses the site selection, design, construction, and operation of a project, as...
Which of the following practices ensures that building systems are designed efficiently, installed appropriately and operate as intended?
Which of the following practices ensures that building systems are designed efficiently, installed appropriately and operate as intended?A . Positive feedback loopB . Negative feedback loopC . Building commissioningD . Building retrocommissioningView AnswerAnswer: C Explanation: Building commissioning is a quality assurance process that begins during the design phase and continues...
What is the process that is performed on existing buildings to identify and recognize system improvements that make the building more suitable for current use?
What is the process that is performed on existing buildings to identify and recognize system improvements that make the building more suitable for current use?A . Energy modelingB . RetrocommissioningC . Life-cycle assessmentD . Fundamental Commissioning (Cx)View AnswerAnswer: B Explanation: Retrocommissioning is a process applied to existing buildings to ensure...