What Sustainable Sites credit will this decision impact the most?
An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?A . Site Development-Protect or Restore HabitaB . Site AssessmentC . Heat Island ReductionD . Light Pollution ReductionView AnswerAnswer: A Explanation:...
In addition to Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Materials Reuse, salvaged materials contribute to the achievement of
In addition to Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Materials Reuse, salvaged materials contribute to the achievement ofA . Materials and Resources Prerequisite, Storage and Collection of RecyclablesB . Materials and Resources Credit, Building Product Disclosure and Optimization - Material IngredientsC . Materials and...
What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?
What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?A . Local building codeB . ASHRAE 62.1-2010C . International Mechanical Code 2012D . The ventilation code requiring the greatest volume of outside airView...
At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's
At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project'sA . environmental zoneB . longitude and latitudeC . ASHRAE 90.1 - 2010 climate zoneD . Environmental Protection Agency Phase I AssessmentView AnswerAnswer: B Explanation: At the time of registering a project...
The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.
The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4. Whole-Building Life-Cycle Assessment is aA . gate-to-gate assessmentB . cradle-to-gate assessmentC . cradle-to-grave assessmentD . cradle-to-cradle assessmentView AnswerAnswer: C Explanation: The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4....
Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?
Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?A . Install an on-site photovoltaic arrayB . Purchase Green-e certified carbon offsetsC . Purchase Green-e certified Renewable Energy Certificates (RECs)D . Install a ground-source...
Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?
Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?A . Floor deckingB . Asbestos insulationC . Exterior glazingD . Plumbing fixturesView AnswerAnswer: A Explanation: The reuse calculation for MR Credit Building Life-Cycle Impact Reduction includes the surface area of structural elements that...
Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?
Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?A . Installing bioretention areaB . Installing on-site renewable power generation facilityC . Substituting impervious surface area with high-albedo paving materialsD . Increase artificial turf on the roofView AnswerAnswer: A Explanation: Installing a bioretention area is an example...
What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?
The material cost for a project is $100,000. What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?A . $10,000B . $12,500C . $22,500D . $25,000View AnswerAnswer: D Explanation: According to the LEED v4...
What threshold must the project surpass in order to demonstrate exemplary performance for Option 2?
A project elects to pursue Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses because of the project's location in an amenity-rich area. The project features 18 uses overall, including at least four uses in three of the five use type categories. What threshold must the...