Which of the following buildings meets the Minimum Program Requirements for LEED certification?
Which of the following buildings meets the Minimum Program Requirements for LEED certification?A . A 1,500 ft2 (139 m2) Tourism Center located on a previously undeveloped one-acre siteB . A 20,000 ft2 (1 859 m2) Transit Parking Garage located on a previously developed five-acre siteC . A 2,500 ft2 (232...
According to the Integrative Process Credit, the discovery phase of energy-related systems should identify
According to the Integrative Process Credit, the discovery phase of energy-related systems should identifyA . ventilation ratesB . functional performance testsC . thermal comfort rangesD . transportation optionsView AnswerAnswer: A Explanation: According to the LEED v4 Reference Guide for Building Design and Construction, the discovery phase of energy-related systems should...
For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?
For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?A . Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimonyB . Fabric, 5% of product by weight, with stain resistant...
In the step-by-step guidance for Location and Transportation Credit, Bicycle Facilities, which of the following requirements can define a bicycle network?
In the step-by-step guidance for Location and Transportation Credit, Bicycle Facilities, which of the following requirements can define a bicycle network?A . One-way streetsB . Bike shareC . Slow speed roadwaysD . Traffic lightsView AnswerAnswer: C Explanation: According to the LEED Reference Guide for Building Design and Construction1, the Location...
Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?
Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?A . 50,000 ft2 (4 645 m2) office projectB . 80,000 ft2 (7 432 m2) hospital projectC . 110,000 ft2 (10 219 m2) school...
Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?
Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?A . ASHRAE 55-2010B . ASHRAE 62.1-2010C . ASHRAE 90.1-2010D . ASHRAE 189.1-2010View AnswerAnswer: A Explanation: To comply with Indoor Environmental Quality Credit, Thermal Comfort, the standard that needs to be followed is...
Which of the following statements is applicable for a project using two alternative water sources?
A project has a potable water source as well as two alternative water sources. Which of the following statements is applicable for a project using two alternative water sources?A . A project may not use two alternative water sourcesB . Target the uses that require the least treatment firstC ....
Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since
Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance sinceA . it is being covered by Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting ControlB...
Which of the following statements is correct when defining the project boundary?
Which of the following statements is correct when defining the project boundary?A . The LEED project boundary cannot include non-contiguous landB . The LEED project boundary cannot include more than one buildingC . The land associated with the project supports typical operationD . The gross floor area of the LEED...
Which of the following Water Efficiency credits differ between LEED Building Design and Construction: New Construction and LEED Building Design and Construction: Healthcare?
Which of the following Water Efficiency credits differ between LEED Building Design and Construction: New Construction and LEED Building Design and Construction: Healthcare?A . LEED Building Design and Construction: Healthcare has no Water Efficiency Credit, Cooling Tower Water UseB . LEED Building Design and Construction: New Construction has no Water...