Which would contribute to compliance with Sustainable Sites Credit, Open Space?
Which would contribute to compliance with Sustainable Sites Credit, Open Space?A . A mall with an indoor atrium, featuring a reflective roofB . A parking lot that serves as the location for a monthly flea marketC . An intensive vegetated roof, provided the building has at least a 1.0 Floor...
A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of
A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To...
Which of the following is true regarding LEED Pilot Credits?
Which of the following is true regarding LEED Pilot Credits?A . Pilot Credits are not specific to the rating systemsB . Pilot Credits can be attempted in the design review stage onlyC . A registered Pilot Credit must be replaced on the LEED project's scorecard if that pilot credit is...
If the building owner wants to decrease the annual energy cost for operating the building, which of the following would be the best design approach?
A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of the following would be the best design approach?A . Install...
Which of the following credits can the LEED AP submit towards certification?
A contractor is building a retirement community project. 30% of the building's product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?A . Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw...
Every location in the U.S. identifies how many regional credits?
Every location in the U.S. identifies how many regional credits?A . FourB . FiveC . SixD . SevenView AnswerAnswer: A Explanation: Every location in the U.S. identifies four regional credits that are of particular importance for that region. These credits are selected by the USGBC regional councils and chapters based...
Which of the following suggestions should the LEED AP give to the project owner?
A LEED Building Design and Construction project includes an outdoor stage for theatrical performances. In pursuit of Sustainable Sites Credit, Light Pollution Reduction the engineer has specified an LED fixture to illuminate actors on the stage while limiting light pollution. Which of the following suggestions should the LEED AP give...
LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as which of the following?
LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as which of the following?A . Batch projectB . Group projectC . Master Site projectD . Neighborhood projectView AnswerAnswer: B Explanation: LEED project boundaries that include multiple similar buildings which are all...
Given these parameters, what are the surrounding residential and nonresidential densities when attempting to achieve Location and Transportation Credit, Surrounding Density and Diverse Uses?
The total land area within a 1/4 mi. (0.40 km) radius of a project boundary consists of 130 acres (53 hectares) and has a residential to nonresidential ratio of 60:40. Within this same total land area, there are 780 dwelling units and1,600,000 ft2 (148 645 m2) of nonresidential building space....
What is a required responsibility for the CxA to achieve the stated objective?
The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?A ....