When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?
- A . Distribute the total number of surveys across all tenants evenly
- B . Distribute the total number of surveys across all tenants proportionately, according to their populations
- C . Distribute the total number of surveys across all tenants proportionately, according to their gross floor area
- D . Distribute the total number of surveys across all tenants proportionately, according to their regularly occupied Area
An office building has an average annual occupancy of 75% and 30,000 ft2 (2 787 m2) of completely vacant space.
How many occupants should be entered into Portfolio Manager for the vacant office space?
- A . Zero occupants
- B . 100 occupants
- C . 150 occupants
- D . 200 occupants
Which of the following is an environmentally friendly technology for controlling erosion?
- A . Mulching
- B . Laying asphalt
- C . Laying tarpaulin material
- D . Spraying water to contain dust
How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?
- A . Six months
- B . 12 months
- C . 18 months
- D . This type of fixture should not be metered
To determine possible credit compliance for Energy and Atmosphere Credit, Advanced Energy Metering, what information needs to be verified?
- A . That the meter data is remotely accessible
- B . That the meter is capable of storing data for at least 12 months
- C . That the meter(s) can be manually read
- D . That the meter(s) record data at a minimum of 15 minute intervals
One tenant occupying 50% of a commercial office building pursuing LEED® O+M certification has provided purchasing data. The other tenants in the building occupying the remaining 50% have chosen not to provide purchasing data.
For credits related to purchasing, the LEED applicant must
- A . estimate the purchases of the other tenants and assume they are compliant in the Materials and Resources credit calculations
- B . estimate the purchases of the other tenants and assume they are noncompliant in the Materials and Resources credit calculations
- C . estimate the purchases of the other tenants and apply the compliance rate from LEED applicant in the Materials and Resources credit calculations
- D . exclude the purchases of the other tenants from the Materials and Resources credit calculations
A property manager is evaluating various bids from pest management services.
Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?
- A . GreenPro, Ecowise, Greenshield
- B . Quality Pro, Ecowise, Greenshield
- C . San Francisco Tier 3, CRI, Green Seal
- D . Green Seal, San Francisco Tier 3, QualityPro
Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?
- A . For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of the water use
- B . For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 120% of the water use
- C . For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 150% of the water use
- D . For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 150% of the water use
Which of the following is a low impact development (LID) technique for rainwater management?
- A . Storm inlet
- B . Rain garden
- C . Detention basin
- D . Impervious pavement
In order for a project team to meet the requirements of Indoor Environmental Quality Credit, Integrated Pest Management, how much advanced notice to building occupants is needed after the emergency application of a pesticide other than the least toxic pesticide?
- A . 12 hours
- B . 24 hours
- C . 48 hours
- D . 72 hours