USGBC LEED AP O+M LEED AP Operations + Maintenance (LEED AP O+M) Online Training
USGBC LEED AP O+M Online Training
The questions for LEED AP O+M were last updated at Apr 12,2025.
- Exam Code: LEED AP O+M
- Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
- Certification Provider: USGBC
- Latest update: Apr 12,2025
What percentage of individual occupant spaces must have individual lighting controls in projects
seeking Option 1.
Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?
- A . 40%
- B . 50%
- C . 60%
- D . 70%
The LEED AP is searching the Addenda Database for LEED Interpretations that pertain to Sustainable Sites Credit, Light Pollution Reduction.
Which interpretations must be used when attempting this credit?
- A . Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published after the project’s registration date that the project thinks is relevant
- B . Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published on the project’s registration date that the project thinks is relevant
- C . Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published before the project’s
registration date that applies to the project’s rating system - D . Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published before the project’s registration date that applies to the project’s rating system
When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management – Ongoing, which strategy may be used to document total and diverted waste?
- A . Measure and document waste in weight or volume
- B . Use replacement value as the metric for ongoing waste
- C . Extrapolate data from one month of the performance period
- D . Do not allow tenant waste outside the building’s waste program to be included
Which of the following is the most appropriate use of untreated stormwater?
- A . Irrigation
- B . Boiler water makeup
- C . Drinking fountain
- D . Cooling water makeup
An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return.
What is the Simple Payback Period for this improvement?
- A . 120 days
- B . 495 days
- C . Two years
- D . Three years
A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project’s gross floor will be completed by the time of occupancy. LEED certification is being sought.
Which rating system would be the most appropriate one to use?
- A . LEED Interior Design and Construction
- B . LEED Building Design and Construction
- C . LEED for Homes
- D . No rating system
Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in the
- A . Basis of Design
- B . Design Narrative
- C . Owner Project Requirements
- D . Current Facility Requirements
The maximum number of points in the Innovation Category that can be achieved by exemplary performance is
- A . one point
- B . two points
- C . three points
- D . four points
Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?
- A . Food
- B . Batteries and lamps
- C . Electric powered equipment
- D . Office equipment, appliances and audiovisual equipment
Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?
- A . Food
- B . Batteries and lamps
- C . Electric powered equipment
- D . Office equipment, appliances and audiovisual equipment