An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?
- A . Energy and Atmosphere Prerequisite, Building-Level Energy Metering
- B . Energy and Atmosphere Credit, Enhanced Refrigerant Management
- C . Energy and Atmosphere Prerequisite, Minimum Energy Performance
- D . Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices
Under Indoor Environmental Quality Credit, Interior Lighting, outlet powered task lighting contributes towards compliance for what category of building space?
- A . Exterior
- B . Lavatory
- C . Mechanical
- D . Individual occupant
What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?
- A . Energy and Atmosphere Credit, Demand Response
- B . Energy and Atmosphere Credit, Ongoing Commissioning
- C . Energy and Atmosphere Credit, Advanced Energy Metering
- D . Energy and Atmosphere Credit, Green Power and Carbon Offsets
Cooling tower blowdown is necessary because
- A . too much water in the system is inefficient so its water levels must be lowered
- B . a buildup of dissolved solids increases conductivity which decreases efficiency
- C . excess water treatment chemical levels corrode pipes and bleed-off reduces chemical levels
- D . cold temperatures can freeze pipes if water is not moved and bleed-off prevents that from happening
For projects not eligible for the ENERGY STAR® rating, the project team could demonstrate compliance with Energy and Atmosphere Prerequisite, Minimum Energy Efficiency Performance by
- A . conducting an energy audit that develops a commissioning plan for the building’s major energy using system
- B . providing a program demonstrating no or low cost measures of improvement to increase energy efficiency
- C . developing a master list of findings identifying systems or pieces of equipment including the defects or problems and proposed solutions
- D . demonstrating an energy efficiency of at least 25% better than the national average for typical buildings of similar type based on energy source
What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
- A . 10% of the vacant space
- B . 10% of the gross floor area
- C . 10% of the project site area
- D . 10% of the regularly occupied area
The measures called out on the following site plan may contribute to the achievement of which LEED credits? (Click on Exhibit)
Exhibit
- A . Sustainable Sites Credit, Rainwater Management; Sustainable Sites Credit, Light Pollution Reduction
- B . Sustainable Sites Credit, Rainwater Management; Sustainable Sites Credit, Heat Island Reduction
- C . Sustainable Sites Credit, Rainwater Management; Location and Transportation Credit, Alternative Transportation
- D . Sustainable Sites Credit, Rainwater Management; Indoor Environmental Quality Credit, Integrated Pest Management
Buildings account for what percentage of total energy use?
- A . 30%
- B . 40%
- C . 50%
- D . 60%
A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning – Analysis, Option 1. Existing Building Commissioning.
At a minimum, what should be included in the Cx Plan?
- A . Cx program overview, project team members, and process activities
- B . Energy Use Breakdown, project team members, and Capital Improvements Measures
- C . Low and No Cost Improvements, Energy Use Breakdown, and Capital Improvements Measures
- D . Cx process activities, Water efficiency optimization strategies, and Energy Use Breakdown
According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?
- A . View Factor 1
- B . View Factor 2
- C . View Factor 4
- D . View Factor 5