USGBC LEED AP ID+C LEED AP Interior Design + Construction (LEED AP ID+C) V4 Online Training
USGBC LEED AP ID+C Online Training
The questions for LEED AP ID+C were last updated at Apr 27,2025.
- Exam Code: LEED AP ID+C
- Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
- Certification Provider: USGBC
- Latest update: Apr 27,2025
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
- A . Commercial dishwashers and coffee makers
- B . Residential clothes washers and dishwashers
- C . Residential dishwashers and drinking fountains
- D . Commercial clothes washers and coffee makers
In a goal-setting workshop, a decision is made to place circulation at the exterior of the office perimeter next to the window wall.
Which of the following is an example of integrated decision-making?
- A . Installing blinds to increase occupant comfort
- B . Darkening the color of the carpet along the perimeter to aid way-finding
- C . Lowering the heating set-point in the circulation space to conserve energy
- D . Issuing user guidelines which limit the height of occupant additions to cubicles along the perimeter
A proposed LEED project will be located within the boundary of a development that has been successfully certified at the Silver level under LEED for Neighborhood Development. The project will earn 10 points from the Location and Transportation Credit, LEED for Neighborhood Development Location.
How many additional credit points are available to the project team under the Location and Transportation category?
- A . Zero additional points are available under the Location and Transportation category
- B . Two additional points are available only in Location and Transportation Reduced Parking Footprint
- C . Eight additional points are available under the Location and Transportation category
- D . 18 additional points are available under the Location and Transportation category
Which of the following would achieve an exemplary performance credit?
- A . Conducting two goal setting workshops
- B . Demonstrating a 55% potable water savings
- C . Achieving an 80% parking capacity reduction
- D . Signing a one-year contract for renewable energy
According to the Integrative Process Credit, Integrative Process the discovery phase of site selection for an existing building should identify
- A . lighting levels
- B . operational schedules
- C . transportation options
- D . thermal comfort ranges