For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?
- A . 6 months
- B . 12 months
- C . 24 months
- D . 36 months
Which energy efficient lamp type is free from mercury?
- A . Compact Fluorescent
- B . High Pressure Sodium
- C . Light Emitting Diode
- D . T-8 Fluorescent
Which of the following will contribute to reducing the heat island effect?
- A . Artificial turf grass
- B . Intensive vegetated roof
- C . Steep sloped roof with initial SRI of 35
- D . Low sloped roof with initial Solar Reflectance Index (SRI) of 64
In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens
- A . must be calculated using at least 20% from an alternative water source
- B . must be calculated using 100% potable water
- C . may be included or excluded from the calculations
- D . may be calculated using a standard 20% reduction from baseline
The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will
- A . be advertised as LEED compliant
- B . be both water efficient and high performing
- C . comply with mandatory federal government regulations
- D . comply with all international plumbing system requirements
Which of the following products are eligible for a WaterSense label?
- A . Tankless toilets
- B . Waterless urinals
- C . Public lavatory faucets
- D . Private lavatory faucets
For schools intended for grades eight and below (or ages 14 and below), which of the following scenarios would demonstrate compliance with Location and Transportation Credit, Access to Quality Transit, Schools, Option 2. Pedestrian Access?
- A . 30% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building
- B . 50% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building
- C . 30% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building
- D . 50% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building
The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.
What credits should the LEED AP suggest to meet this goal?
- A . Sustainable Sites Credit, Heat Island Reduction and Location and Transportation Credit, Bicycle Facilities
- B . Location and Transportation Credit, Access to Quality Transit and Location and Transportation Credit, Sensitive Land Protection
- C . Location and Transportation Credit, Surrounding Density and Diverse Uses and Sustainable Sites Credit, Open Space
- D . Location and Transportation Credit, Reduced Parking Footprint and Location and Transportation Credit, Access to Quality Transit
Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?
- A . Install an on-site photovoltaic array
- B . Purchase Green-e certified carbon offsets
- C . Purchase Green-e certified Renewable Energy Certificates (RECs)
- D . Install a ground-source heat pump
A LEED AP submitted a Preliminary Design and Construction review and has received a review comment and technical advice on Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning.
Which of the following actions should the LEED AP do if the project continues to pursue LEED certification?
- A . Revise the documentation and resubmit the form
- B . Abandon meeting this prerequisite
- C . Submit an appeal to Green Business Certification Inc.
- D . Ask the General Contractor to be more aggressive with recycling goals