At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project’s
- A . environmental zone
- B . longitude and latitude
- C . ASHRAE 90.1 – 2010 climate zone
- D . Environmental Protection Agency Phase I Assessment
Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?
- A . Burning fossil fuels
- B . Smoking tobacco products
- C . Preparing non-organic foods
- D . Manufacturing toxic chemicals
What is a benefit of including the public in a charrette for a new school before the pre-design phase?
- A . Neighbors can plan for future construction
- B . It will help streamline the permitting process
- C . Potential partnerships with the community can be revealed
- D . The owner can determine financial strategies based on the public’s input
Which of the following contributes to the value of the commissioning process?
- A . Ensuring that the project budgetary goal is met
- B . Verifying that the building systems perform as intended
- C . Verifying that the building water fixtures are installed properly
- D . Ensuring that the project is delivered to meet the permitting requirements
What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?
- A . Healthcare
- B . Schools
- C . Data centers
- D . Hospitality
Which of these is a method to assess the regional context of a building’s design for sustainability?
- A . Conducting a site analysis
- B . Consulting with neighbors
- C . Improving a design threshold
- D . Performing an energy analysis of the building
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate
- A . all luminaires have full cutoff fixtures
- B . all luminaires have a minimum color temperature of 3500 K
- C . all luminaires meet acceptable fixture ratings for the project’s Model Lighting Ordnance (MLO) lighting zone
- D . all luminaires are mounted at least three mounting heights from the lighting boundary
A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room.
How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?
- A . 91 lighting control devices
- B . 93 lighting control devices
- C . 100 lighting control devices
- D . 103 lighting control devices
Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?
- A . ASHRAE 55-2010
- B . ASHRAE 62.1-2010
- C . ASHRAE 90.1-2010
- D . ASHRAE 189.1-2010
Which of the following documents contains the design team’s interpretation of the Owner’s Project Requirements?
- A . Basis of Design (BOD)
- B . Simple Box Energy Model Analysis
- C . System’s manual
- D . Integrated Project Delivery report