When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner’s Project Requirements (OPR)?
- A . All applicable codes and standards
- B . Interior finishes related to the project
- C . All project team members and applicable roles
- D . Energy efficiency goals and training requirements
Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since
- A . it is being covered by Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control
- B . it is specifically exempted by ASHRAE
- C . it will be installed by the owner
- D . the lamp wattage has not been determined
Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?
- A . Retail
- B . Schools
- C . Healthcare
- D . Core and Shell
What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?
- A . One
- B . Two
- C . Four
- D . Six
Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?
- A . Retail
- B . Schools
- C . Healthcare
- D . Core and Shell
A newly constructed school has installed solar thermal systems and wind turbines on site.
To achieve the maximum number of Energy and Atmosphere points, which team members must be included?
- A . Energy Modeler and Contractor
- B . Construction Manager and Energy Modeler
- C . Energy Modeler and Commissioning (Cx) Agent
- D . Commissioning (Cx) Agent and Facilities Manager
When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?
- A . Perform a preliminary water budget analysis before the completion of schematic design
- B . Install permanent metering on both the water sources and the waste water leaving the site
- C . At the completion of schematic design, count the fixtures and apply the maximum flow rate
- D . Estimate consumption by using 20 gal. per day (76 I per day) for each Full Time Equivalent (FTE) scheduled to occupy the building
In the step-by-step guidance for Location and Transportation Credit, Bicycle Facilities, which of the following requirements can define a bicycle network?
- A . One-way streets
- B . Bike share
- C . Slow speed roadways
- D . Traffic lights
Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?
- A . Installing bioretention area
- B . Installing on-site renewable power generation facility
- C . Substituting impervious surface area with high-albedo paving materials
- D . Increase artificial turf on the roof
Which of the following strategies would be considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection?
- A . Build a two-story fitness facility
- B . Change the grade to install a security fence
- C . Provide a vehicular access drive that is less than 16 ft. (5 m) in width
- D . Remove trees that are less than 6 inches (15.24 cm) diameter at breast height