USGBC LEED AP BD+C LEED AP Building Design + Construction Online Training
USGBC LEED AP BD+C Online Training
The questions for LEED AP BD+C were last updated at Nov 19,2024.
- Exam Code: LEED AP BD+C
- Exam Name: LEED AP Building Design + Construction
- Certification Provider: USGBC
- Latest update: Nov 19,2024
What is the maximum number of points a project pursuing LEED for New Construction can achieve under Location and Transportation Credit, Access to Quality Transit?
- A . Two points
- B . Three points
- C . Four points
- D . Five points
Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?
- A . A sink in an office restroom
- B . A sink in a school classroom
- C . A sink in a hotel room bathroom
- D . A sink in a shared office restroom
Which one of the following represents quality transit service as defined in Location and Transportation Credit, Access to Quality Transit?
- A . A bus stop served by two bus lines Monday through Friday, located 1/8 mi. (0.20 km) from the project building
- B . A rail station served by one train line Monday through Sunday, located 1/2 mi. (0.80 km) fromthe project building
- C . A rail station served by two train lines Monday through Sunday, located 1 mi. (1.60 km) from the project building
- D . A private shuttle bus stop providing hourly service Monday through Friday to a rail station two hours away, located across the street from the project building
The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor
Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?
- A . 0.144 CFM/ft2 (0.73 (L/s)/m2)
- B . 0.156 CFM/ft2 (0.79 (L/s)/m2)
- C . 0.168 CFM/ft2 (0.85 (L/s)/m2)
- D . 0.30 CFM/ft2 (1.5 (L/s)/m2)
Which of the following must be included in the Sustainable Sites Credit, Site Assessment?
- A . A targeted Brownfield remedy plan
- B . Historic preservation plan to include neighboring properties
- C . Proximity of vulnerable populations to major sources of air pollution
- D . The surrounding density within a 1/4 mi. (0.40 km) radius of the project boundary
What is the definition of the evapotranspiration rate?
- A . Evaporation of onsite reuse water
- B . Percentage of potable water usage for irrigation
- C . Water loss from evaporation in micro irrigation systems
- D . Amount of water loss in a vegetated surface in units of water depth
What type of project would benefit from showing compliance with Energy and Atmosphere Prerequisite, MinimumEnergy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?
- A . One in which the budget and timeline would benefit from simplified decision making and analysis during the project design
- B . One in which the project team wants to explore the energy performance and load reduction effects of severalenvelope and lighting designs and mechanical systems
- C . One in which the project team wants to achieve efficiency trade-offs between systems, offsetting the lower efficiency of one system by the improved efficiency of another
- D . One in which the owner wants an estimate of the carbon reductions or lower operating costs (energy savings, demand charge savings) from energy strategies, beyond a simple calculation for individual energy conservation measures
A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings on all four sides.
If the building owner wants to decrease the annual energy cost for operating the building, which of the following would be the best design approach?
- A . Install glazing with a higher solar heat gain factor
- B . Install photovoltaic panels on the sides of the building
- C . Increase outdoor air intake quantities during summer months
- D . Recover waste energy through exhaust air energy recovery systems
For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include
- A . verification that a weighted daily average has been used for each qualifying route
- B . confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop
- C . verification that a weighted building average has been used for each qualifying functional entry
- D . confirmation that each qualifying route features paired route service (service in opposite directions)
Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?
- A . 50,000 ft2 (4 645 m2) office project
- B . 80,000 ft2 (7 432 m2) hospital project
- C . 110,000 ft2 (10 219 m2) school project
- D . 140,000 ft2 (13 006 m2) retail project