The project material costs for Building Product Disclosure and Optimization cost-based credits are
The project material costs for Building Product Disclosure and Optimization cost-based credits are
A . actual costs, furniture included
B . default costs, 30% of total construction cost
C . actual costs, furniture optional
D . default costs, 40% of total construction cost
Answer: C
Explanation:
The costs considered for Building Product Disclosure and Optimization (BPDO) cost-based credits should reflect the actual costs of the materials used in the project. Furniture is considered optional for these calculations. This approach allows for flexibility in reporting and aligns with the intent of the BPDO credits to encourage the use of sustainable materials.
Reference: The information is based on the guidelines provided by the U.S. Green Building Council for LEED v4 ID+C MR Credits Building Product Disclosure and Optimization1234.