The following assumption can bemade that significantly impact the calculated corrosion rate early in the equipment life
A . If the base line thickness were not performed the nominal thickness may be used for the original thickness
B . If original thickness not available, averaged ut thickness readings may be used
C . If the original thickness not available, maximum utthickness readings may be used

Answer: A