The correct installation method is the precondition for ensuring the normal operation of the ONU. Which of the following is the wrong installation method?
A . Ground wire connected to ground bar
B . The casing of the customer line should be protected with a sleeve
C . Fiber optic dust caps should be installed when the optical fiber is not in use
D . Signal lines and power lines should be centralized
Answer: D
Latest H35-211-ENU Dumps Valid Version with 238 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund