The base metal is P.No.8, the weld metal is A . No.8-9, and the wall thickness is 1”, what is the hold time for heat treatment
The base metal is P.No.8, the weld metal is A . No.8-9, and the wall thickness is 1”, what is the hold time for heat treatment
A. None
B. 1 hour
C. 2 hours
D. ½ hour for each 1” thickness
Answer: A
Latest API-570 Dumps Valid Version with 150 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments