Which stakeholder of a project team is responsible to provide closeout documentation to the client? Architect
Which stakeholder of a project team is responsible to provide closeout documentation to the client? ArchitectA . AuthorityB . Having Jurisdiction (AHJ)C . Construction ManagerD . ICT Distribution Designer/Project ManagerView AnswerAnswer: D
Which of the following information about the site shall be included?
An ICT distribution designer is reviewing design documents with the owner to gam approval for an ER design. Which of the following information about the site shall be included?A . Sustainability requirementsB . Suitability requirementsC . Access and/or service provider requirementsD . Designer requirementsView AnswerAnswer: C
An ICT distribution designer is estimating the installation of five units of 1.5 m (5 ft) tong channel basket trays connected together in the ceiling. The total length of the pathway needed is 7 5 m (25 ft).
An ICT distribution designer is estimating the installation of five units of 1.5 m (5 ft) tong channel basket trays connected together in the ceiling. The total length of the pathway needed is 7 5 m (25 ft). How many supports will be needed''A . 2B . 5C . 7D...
What is the MAXIMUM number of work areas served by a single Multiuser Telecommunications Outlet Assembly (MUTOA)?
What is the MAXIMUM number of work areas served by a single Multiuser Telecommunications Outlet Assembly (MUTOA)?A . 5B . 10C . 12D . 18View AnswerAnswer: C
During bidding the ICT distribution designer should review the bid responses for compliance and completeness. Afterwards, the designer should report the findings and recommendations to the
During bidding the ICT distribution designer should review the bid responses for compliance and completeness. Afterwards, the designer should report the findings and recommendations to theA . construction foremanB . legal counselC . stakeholdersD . technical consultantView AnswerAnswer: C
Identify the fibers below as either single mode (SM) or multi-mode (MM) by dragging the appropriate term into each oval
DRAG DROP Identify the fibers below as either single mode (SM) or multi-mode (MM) by dragging the appropriate term into each oval. View AnswerAnswer:
Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?
Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?A . Verify the equipment controls are in the proper operating position.B . Train workers to perform the LOTO process.C . Apply appropriate tags both locally and remotely.D . Confirm the device is de-energized by proving it...
Which two of the following are means in which radiated interference primarily enters electronic devices? (Select two options.)
Which two of the following are means in which radiated interference primarily enters electronic devices? (Select two options.)A . Proximity to interfering sourcesB . Missing or inadequate optical connectionsC . Missing or inadequate device or cable shieldingD . Interface designsE . Input signal linesView AnswerAnswer: A, C
For the MAXIMUM flexibility of a cabling system in a hierarchical star topology, ALL backbone cables and links to FR's should be terminated at the
For the MAXIMUM flexibility of a cabling system in a hierarchical star topology, ALL backbone cables and links to FR's should be terminated at theA . HC (FD).B . IC (BD).C . TRD . MC (CD)View AnswerAnswer: D
Which of the following statements Is CORRECT concerning best practice for horizontal cable management panels?
Which of the following statements Is CORRECT concerning best practice for horizontal cable management panels?A . One RU of management panel for each RU of cable patch panel plus one additional RU of cable managementB . Two RU of cable management panel for each RU of patch panelC . Three...