What is the MAXIMUM recommended length for A in the image below?
What is the MAXIMUM recommended length for A in the image below? A . 70 m (230 ft) B. 90 m (295 ft) C. 100 m (320 ft) D. 150 m (495 ft) E. 300 m (985 ft)View AnswerAnswer: B
As a project manager, what should the FINAL task be at of the end of each project?
As a project manager, what should the FINAL task be at of the end of each project?A . A costing and billing review B. Delivery of the final documentation C. A lessons learned meeting D. A sign off meeting with the ownerView AnswerAnswer: C
Which of the following is TRUE for tele communications spaces?
Which of the following is TRUE for tele communications spaces?A . Maintain aim (3.28 ft) clearance between equipment and plumbing fixtures such as mop sinks B. Plumbing piping not related to the support of the space should not pass through the space. C. Relative humidity snail be maintained at 40%...
What is the derating factor for a 24 AWG (0.51 mm) stranded cords?
What is the derating factor for a 24 AWG (0.51 mm) stranded cords?A . 10% B. 20% C. 30% D. 50% E. 60%View AnswerAnswer: B
An ICT distribution designer is preparing a price quote for a building design with multiple floors originally sized at 40.000 ft (3716 m2). While the designer is preparing the quote, the structural engineer indicates the building has been increased in size to accommodate an additional 40,000 ft2 (3716 m3) per floor. The designer's recommendation to the engineer will be to increase the slot area by_____for each additional 40,000 ft3 (3716 m2)
An ICT distribution designer is preparing a price quote for a building design with multiple floors originally sized at 40.000 ft (3716 m2). While the designer is preparing the quote, the structural engineer indicates the building has been increased in size to accommodate an additional 40,000 ft2 (3716 m3) per...
What should the program manager do to ensure communications on the component projects are consistent?
The project manager of project A develops a communications management plan. The project manager of project B is new and is uncertain how to develop appropriate communications for the company's staff What should the program manager do to ensure communications on the component projects are consistent?A . Request a more...
Which stakeholder of a project team is responsible to provide closeout documentation to the client? Architect
Which stakeholder of a project team is responsible to provide closeout documentation to the client? ArchitectA . Authority B. Having Jurisdiction (AHJ) C. Construction Manager D. ICT Distribution Designer/Project ManagerView AnswerAnswer: D
Close out documentation is initially discussed in which of the following meetings?
Close out documentation is initially discussed in which of the following meetings?A . Prime Contractor and Subcontractor Meetings B. Kickoff Meeting C. Weekly Progress Meetings D. Vendor MeetingView AnswerAnswer: A
A MINIMUM separation distance of 305 mm (12 in) between telecommunication cables and power cables with EMI exceeding 5 kVA is acceptable in which of the following cases?
A MINIMUM separation distance of 305 mm (12 in) between telecommunication cables and power cables with EMI exceeding 5 kVA is acceptable in which of the following cases?A . Power cables are unshielded, while telecommunication cables are enclosed in a grounded metal conduit pathway. B. Power cables are unshielded, while...
What should program A's program manager update and review first with the stakeholders?
Program A is dependent upon program B lo complete benefits sustainment for two benefits Program A is on track to meet program benefits However program B's program manager has just advised that program B has been closed. What should program A's program manager update and review first with the stakeholders?A...