Which two test plan items should the SE map to POC success criteria?
In a competitive POC scenario, the prospect is testing Nutanix against VxRail and Hyperflex. The customer is interested in an ""All in One"" solution that's simple to deploy, manage, and grow. Which two test plan items should the SE map to POC success criteria? (Choose two)A . Deploy HCIbench to...
A systems engineer sizers an environment based on the customer's requirement of N+2 resiliency for the entire cluster. In which two ways could the configuration be changed to meet the customer's requirements? (Choose Two)
A systems engineer sizers an environment based on the customer's requirement of N+2 resiliency for the entire cluster. In which two ways could the configuration be changed to meet the customer's requirements? (Choose Two)A . Increase the RAM capacity per NodeB . Increase the number of NodesC . Increase the...
Which two Nutanix capabilities should be leveraged?
A prospect customer's expected workload consists of the following: 110 vCPU 512GB RAM * 500TB Storage They need a solution to help decrease storage costs. The majority of their storage requirements come from an imaging application that stores scanned JPEG images. Which two Nutanix capabilities should be leveraged? (Choose two.)A...
Which two Nutanix platform capabilities should the SE hlight to address the prospects concerns?
A prospect needs to refresh their environment but has a very small budget for the project. Four years after their last infrastructure refresh, the prospect's core datacenter is only running at 40% utilization. In addition, they have 25 satelite offices. Each office has a requirement to run 4 to 6...
Which two changes should the systems engineer propose to meet the customer requirements?
A customer needs to increase availability in their Nutanix environment by enabling rack awareness. The current configuration consists of: 1 RF2 cluster consisting of 7 identical NX-3170 1U nodes, All Storage efficiencies are disabled. Which two changes should the systems engineer propose to meet the customer requirements? (Choose two)A ....
Which Nutanix product should the systems engineer position?
An online retailer currently support over 200 separate PostgreSQL database instances, often with more than 10 copies of each individual database. Their Database Administrators have scripted much of the deployment process for creating dev/test copies, but their infrastructure team struggles to keep up with storage capacity demands. Which Nutanix product...
Which two menus should be used to check the current configuration?
A VOI environment based on AHV Cluster is not performing well. The current environment is using only one bridge (BridgeO). An administrator need to verify if nodes are using all network card associated to BridgeO. Which two menus should be used to check the current configuration? (Choose two.)A . Host...
What is the main function of Oplog?
What is the main function of Oplog?A . A persistent write buffer to coalesce bursts of random writes before destaging to the extend storeB . A memory cache to coalesce all writes before destaging to the extent storeC . A persistent write buffer to coalesce all writes before destaging to...
What should the administrator do?
Refer to Exhibit: An administrator logs in to Prism and sees the status shown in the exhibit within the Hardware Diagram section. What should the administrator do?A . Reseat all disk immediately. If this does not help, reseat the nodes.B . Check status of applications running on the cluster and...
Which feature should be discussed to address this objection?
A prospect uses VMware, Oracle and Microsoft products for their critical operations. The prospect prefers an all-flash array because they have significantly invested in servers for their oracle environment to save on licensing costs. Which feature should be discussed to address this objection?A . AHVB . Hyper-V Support.C . ABSD...